
- Riser
- 35 m
- Includes
- Liquid seal, tip, piping, access
- Welding
- Procedures qualified in house
- Destination
- USA
- Status
- Delivered
The project
Pressure parts need qualified welding procedures and full traceability, which we built for this order.
What we made
- Welding procedure qualification
- Riser sections in flanged shipping lengths
- Liquid seal drum
- Flare tip, piping and access
- Painting and in-house assembly
How we built it
- Three-roll pinch cum pyramid plate rollsRiser cans and the seal drum rolled in house.
- Submerged-arc (SAW) welding lineLong seams on the submerged-arc line.
Delivered and followed by a repeat order, with an enclosed ground flare to come.
More case studies
Start a project
Send us a drawing
A project like this?
Send the drawings and an engineer will tell you how we would build it.


