A 35 m flare riser with its liquid seal
  1. Home
  2. Projects
  3. A 35 m flare riser with its liquid seal
Case study · Oil & gas

A 35 m flare riser with its liquid seal.

Our first pressure-part project: a 35 m elevated flare riser with its liquid seal drum, flare tip, piping and access, built to qualified welding procedures.

Riser
35 m
Includes
Liquid seal, tip, piping, access
Welding
Procedures qualified in house
Destination
USA
Status
Delivered
The project

Pressure parts need qualified welding procedures and full traceability, which we built for this order.

What we made
  • Welding procedure qualification
  • Riser sections in flanged shipping lengths
  • Liquid seal drum
  • Flare tip, piping and access
  • Painting and in-house assembly
How we built it

Delivered and followed by a repeat order, with an enclosed ground flare to come.

Start a project

A project like this?

Send the drawings and an engineer will tell you how we would build it.

Send us a drawing