A twin-cell long-line mould for the Mumbai-Ahmedabad high-speed rail, fabricated by Allmarc
  1. Home
  2. Industries
  3. High-Speed Rail & Railways
High-speed rail & railways

Built for trains at 350 km/h.

Moulds, precast elements and steel products for India’s first bullet train, approved by NHSRCL, and an RDSO-approved line for railway girders.

The products Send us a drawing
Mumbai-Ahmedabad high-speed rail

The only maker with both moulds and precasting.

We design and make the moulds, and cast the elements with them on site: noise barriers, cable ducts, piers and pier caps for the C4, C6 and C7 packages.

Several of these had been made by only one or two companies in the world before us. Each mould is assembled to tolerance, certified by the client, and supported on site through its first two casts.

0noise barrier moulds supplied
0elements precast on site
NHSRCLapproved products
C4 · C6 · C7packages supplied
Products

Firsts for India.

Allwell deep foundation Shinso piles Shinso piles

Deep foundations for urban sites and ground beside running railway lines, protecting track foundations from vibration and collapse with a bore of 12 m or less.

  • First in India, third in the world after Japan and China
  • Supplied to the C7 package; approved by NHSRCL
See it in 3D
Steel and rubber Seismic stoppers Seismic stoppers

Placed between the pier cap and the viaduct segment to stop an earthquake shaking the viaduct off its piers, where trains run at over 300 km/h.

  • Second maker in India
  • Supplied to the C7 package; approved by NHSRCL
Moulds and precasting Noise barrier moulds Noise barrier moulds

Moulds for a precast wall with a cavity for sound dampers: 90 mm thin at 2.4 m high, a C-profile and many precise chamfers that must survive shuttering and de-shuttering.

  • First in India, second in the world
  • 600+ moulds to the C4, C6 and C7 packages; approved by NHSRCL
See it in 3D
Moulds Track slab moulds Track slab moulds

Track slabs replace sleepers and spread the load evenly at 350 km/h. The mould is over 5 m long for a slab kept to 190 mm.

  • Second in the world after Japan
  • Developed; approval in progress
See it in 3D
Moulds Pier, pier cap and segment moulds Pier, pier cap and segment moulds

Moulds for the viaduct’s columns, their heads and the segments between them: large elements beyond most small workshops.

  • Among the top five makers in India
  • Supplied to the C4, C6 and C7 packages; approved by NHSRCL
See it in 3D
Steel products U cable duct moulds, maintenance galleries, evacuation barriers, metal fences U cable duct moulds, maintenance galleries, evacuation barriers, metal fences

Further steel products for the Mumbai-Ahmedabad line.

  • Supplied
See it in 3D
Projects

On the line.

All projects
Railways

An RDSO-approved line.

Unit 2 is built for RDSO railway girders and precision sheet metal for coaches. Our bullet-train work has built trust with railway stakeholders.

RDSO girders

Built-up girders on our beam lines, with SAW welding and CNC drilling.

Coach sheet metal

Precision sheet metal on the 20 kW laser, punching and press brakes.

Anti-slip decking for coaches

A decade of fitting Grip-Strut anti-slip decking to site conditions, now offered to the modern Indian coach industry.

Start a project

A mould no one else has made?

Send the drawing. Several of our moulds were the first of their kind in India.

Send us a drawing