
- Home
- Industries
- High-Speed Rail & Railways
Built for trains at 350 km/h.
Moulds, precast elements and steel products for India’s first bullet train, approved by NHSRCL, and an RDSO-approved line for railway girders.
The only maker with both moulds and precasting.
We design and make the moulds, and cast the elements with them on site: noise barriers, cable ducts, piers and pier caps for the C4, C6 and C7 packages.
Several of these had been made by only one or two companies in the world before us. Each mould is assembled to tolerance, certified by the client, and supported on site through its first two casts.
Firsts for India.
Shinso piles
Deep foundations for urban sites and ground beside running railway lines, protecting track foundations from vibration and collapse with a bore of 12 m or less.
- First in India, third in the world after Japan and China
- Supplied to the C7 package; approved by NHSRCL
Seismic stoppers
Placed between the pier cap and the viaduct segment to stop an earthquake shaking the viaduct off its piers, where trains run at over 300 km/h.
- Second maker in India
- Supplied to the C7 package; approved by NHSRCL
Noise barrier moulds
Moulds for a precast wall with a cavity for sound dampers: 90 mm thin at 2.4 m high, a C-profile and many precise chamfers that must survive shuttering and de-shuttering.
- First in India, second in the world
- 600+ moulds to the C4, C6 and C7 packages; approved by NHSRCL
Track slab moulds
Track slabs replace sleepers and spread the load evenly at 350 km/h. The mould is over 5 m long for a slab kept to 190 mm.
- Second in the world after Japan
- Developed; approval in progress
Pier, pier cap and segment moulds
Moulds for the viaduct’s columns, their heads and the segments between them: large elements beyond most small workshops.
- Among the top five makers in India
- Supplied to the C4, C6 and C7 packages; approved by NHSRCL
U cable duct moulds, maintenance galleries, evacuation barriers, metal fences
Further steel products for the Mumbai-Ahmedabad line.
- Supplied
On the line.
An RDSO-approved line.
Unit 2 is built for RDSO railway girders and precision sheet metal for coaches. Our bullet-train work has built trust with railway stakeholders.
RDSO girders
Built-up girders on our beam lines, with SAW welding and CNC drilling.
Coach sheet metal
Precision sheet metal on the 20 kW laser, punching and press brakes.
Anti-slip decking for coaches
A decade of fitting Grip-Strut anti-slip decking to site conditions, now offered to the modern Indian coach industry.
A mould no one else has made?
Send the drawing. Several of our moulds were the first of their kind in India.