1. Home
  2. Products
  3. Precast Infrastructure Moulds
  4. U Cable Duct Mould
Products · Moulds

U Cable Duct Mould

Gang moulds for the precast cable ducts of high-speed rail. One mould casts 4 ducts at a time, with shared outer shutters and a separate inner core for each.

Explore the 3D model Send us a drawing
Allmarc 3D model · to scale
Built to your size

Cavities, duct size and length follow your duct.

The mould is made to the duct drawing. The model shows 4 cavities, each 2 m long.

4
cavities per mould
Shared
outer shutters
One per duct
inner cores
Explore the model

How it is built.

Scroll: the camera moves to each part in turn and ends on the exploded view. Drag to turn it round yourself.

Loading model 0%

01 / 10

How this mould works

Cable ducts are small and needed in thousands, so 4 are cast side by side in one mould.

Scroll to see how it is built · drag to turn it round

02 / 10

Side shutters

A steel skin plate follows the outline of the unit on each side. It is cut on the laser and formed to the section.

How is it possible at Allmarc?

Used here for: Side shutters

In 2024 we were the only buyer of Deratech’s 20 kW, 12 m laser.

  • 20 kW
  • 12 x 3 m bed
  • Pallet changer
All our machinery
Deratech 8 m tandem press brake in the Allmarc works

Used here for: Side shutters

  • 8 m bending length
  • Tandem technology
All our machinery

03 / 10

Ribs and walers

A rib every metre and walers along the length hold the skin to shape against the pressure of wet concrete.

How is it possible at Allmarc?
ABB robotic MIG welding cells in the Allmarc works

Used here for: Ribs and walers

  • Three-phase robotic MIG
  • Automatic special-purpose welding machines
All our machinery

04 / 10

Soffit bed and base frame

The unit is cast on the soffit bed. The bed sits on longitudinal and cross beams on legs, bolted down and levelled.

How is it possible at Allmarc?
Kotec newRun10DX CNC beam drilling line in the Allmarc works

Used here for: Soffit bed and base frame

Heavy profiles that need precise holes, where plasma cannot do the job: the lower structure and panel borders of a ground flare, and every bolted PEB and multi-storey frame.

  • H-beams up to 1,000 x 500 mm
  • Drills 3 faces in one pass
  • Channels, angles and box sections
All our machinery

05 / 10

Inner core

The inner core forms the inside of the unit. It lifts out or collapses inward to strip.

06 / 10

Props and clamps

Screw props or clamps hold each shutter in place and pull it back to strip.

07 / 10

End bulkheads

Stop ends cut to the section close the mould at each end.

08 / 10

Vibrators

External vibrators on the walers compact the concrete through the skin.

09 / 10

The unit it casts

The concrete unit is shown part way along the mould.

10 / 10

Every part

Shutters, ribs, soffit, base frame and bulkheads.

Delivered by Allmarc

Projects with this product.

All projects
Why Allmarc

Experience you can trust.

We fabricate to your drawings and prove the fit in our own bay before anything ships. Open any line for the detail.

Talk to an engineer
Heavy or delicate
  • 600 T flare chambers and 1 to 2 mm sheet metal, under one roof.
  • Each job goes to the plant built for it.
Repeat parts, identical
  • Fixtures, robots and CNC lines, so the hundredth matches the first.
  • Machined after welding where it matters.
Proven before it ships
  • Trial-assembled in the works.
  • Inspected and documented at every stage.
Scale
  • 4 plants at Kanbha; about 6,000 T a month from November 2026.
  • ISO 9001, ISO 45001, EN 1090, EN ISO 3834-3; RDSO approved.
Start a project

Have a drawing? Let us build it.

We fabricate to your design, from plate to a packed container. An engineer will tell you honestly how we would build it.

Send us a drawing